Complete Guide to Home Electrical Panel Upgrades
By Ranch and Coast Electric|Updated 2025-01-15|12 min read
# Complete Guide to Home Electrical Panel Upgrades
Your electrical panel is the heart of your home's electrical system. Every circuit in your house runs through it, and when it can no longer keep up with your power demands, things start going wrong. Breakers trip constantly. Lights flicker when you run the microwave. You want to add a home EV charger or a second air conditioning unit, and there is simply no room left.
If any of that sounds familiar, you are probably due for a panel upgrade. This guide walks you through everything you need to know, from recognizing the warning signs to understanding costs and permits here in Florida.
## Table of Contents
- [Signs Your Electrical Panel Needs an Upgrade](#signs-your-electrical-panel-needs-an-upgrade)
- [Understanding Panel Amperage: 100A vs 200A vs 400A](#understanding-panel-amperage-100a-vs-200a-vs-400a)
- [Dangerous Panels: Federal Pacific and Zinsco](#dangerous-panels-federal-pacific-and-zinsco)
- [Cost Breakdown for Florida Homeowners](#cost-breakdown-for-florida-homeowners)
- [Florida Permit Requirements](#florida-permit-requirements)
- [The Upgrade Process Step by Step](#the-upgrade-process-step-by-step)
- [DIY vs Professional Installation](#diy-vs-professional-installation)
- [Frequently Asked Questions](#frequently-asked-questions)
## Signs Your Electrical Panel Needs an Upgrade
Not every electrical issue points back to the panel, but many do. Here are the most reliable indicators that your panel has reached its limit.
### Frequent Breaker Trips
A breaker that trips once during an unusual power draw is doing its job. A breaker that trips every time you run the hair dryer while the AC is running is telling you something different. Frequent tripping usually means circuits are overloaded, and when multiple circuits trip regularly, the panel itself may lack sufficient amperage for your home's demands.
### Burning Smell or Scorch Marks
This is an emergency. If you smell burning plastic or see discoloration around your panel, stop reading this guide and call a licensed electrician. Scorch marks indicate arcing or overheating inside the panel, both of which are fire hazards that demand immediate attention.
### You Still Have a Fuse Box
Fuse boxes were standard in homes built before the 1960s. They work, but they were designed for a time when homes drew 30 to 60 amps total. Modern households regularly pull 150 amps or more. Beyond the capacity issue, fuse boxes lack the safety features built into modern circuit breakers, including arc-fault protection and ground-fault interruption.
### Lights Dim or Flicker
When your lights dim every time the air conditioner kicks on, your panel is struggling to distribute power evenly. This is especially common in older Florida homes where the original 100-amp panel now supports modern HVAC systems that were never part of the original load calculation.
### You Are Adding Major Appliances
Planning to install an [EV charger](/services/ev-charger-installation), add a hot tub, build a home addition, or put in a second AC unit? Each of these requires significant amperage. A 40-amp EV charger circuit alone represents 20% of a 200-amp panel's capacity. If your panel is already near capacity, you will need an upgrade before adding new loads.
### Double-Tapped Breakers
Open your panel door and look at the breakers. If you see two wires connected to a single breaker that is only rated for one, someone has tried to squeeze more circuits into a full panel. This is a code violation and a fire hazard. It is also a clear sign that your panel has run out of space.
### Your Home Is Over 25 Years Old
Electrical codes and household power demands have both changed significantly since the late 1990s. A panel installed in 2000 was not designed to handle today's smart home devices, multiple large-screen TVs, home offices with server equipment, electric vehicles, or modern HVAC systems.
## Understanding Panel Amperage: 100A vs 200A vs 400A
Choosing the right panel size is not just about what you need today. It is about anticipating what you will need over the next 20 years.
### 100-Amp Panels
A 100-amp panel was the standard for new construction through the 1970s and into the 1980s. For a small home under 1,500 square feet with gas appliances and no plans for major additions, 100 amps can still be adequate. However, this is increasingly rare. Most electricians today consider 100 amps the bare minimum for residential service, and many utility companies and local codes in Florida now require 200-amp service for new construction.
A 100-amp panel typically provides 20 to 24 circuit spaces. That sounds like plenty until you count up your existing circuits and realize you need dedicated circuits for the kitchen, bathrooms, laundry, HVAC, water heater, and garage, and you have already used half the panel before you get to general lighting and outlets.
### 200-Amp Panels
A 200-amp panel is the current standard for most single-family homes in Florida. It provides enough capacity for central air conditioning, an electric range, a dryer, a water heater, and still leaves room for future additions like an EV charger or a pool pump.
Most 200-amp panels offer 40 to 42 circuit spaces, which gives you room to run [dedicated circuits](/services/dedicated-circuits) for home offices, workshops, and other specialty loads without worrying about running out of space.
For the majority of homeowners in [Sarasota](/areas/sarasota), [Tampa](/areas/tampa), and [Bradenton](/areas/bradenton), a 200-amp panel is the right choice. It handles today's demands comfortably and provides a reasonable buffer for the future.
### 400-Amp Panels
A 400-amp service is typically reserved for large homes over 4,000 square feet, homes with multiple HVAC systems, heated pools, workshops with heavy equipment, or properties that combine residential living with significant accessory structures like guest houses or large detached garages.
The 400-amp setup usually involves two 200-amp panels fed from a single 400-amp meter base. This gives you the total capacity of 400 amps while keeping the circuit distribution manageable across two separate panels.
Some homeowners who are fully electrifying their homes, replacing gas with electric heat pumps, adding solar with battery backup, and installing EV chargers for multiple vehicles, are finding that 400-amp service makes sense even in moderately sized homes. If you are planning a major electrification project, it is worth discussing 400-amp service with your electrician.
## Dangerous Panels: Federal Pacific and Zinsco
Not all panel upgrades are about capacity. Some are about safety. Two brands of electrical panels, Federal Pacific Electric (FPE) and Zinsco (also sold as GTE Sylvania), have well-documented histories of failure.
### Federal Pacific Electric (FPE) Stab-Lok Panels
Federal Pacific Electric panels with Stab-Lok breakers were installed in millions of American homes between the 1950s and 1980s. Studies, including testing performed by the Consumer Product Safety Commission, have found that these breakers fail to trip at rates far exceeding industry standards. Some tests showed failure rates of 25% or higher.
When a breaker fails to trip during an overload or short circuit, wires overheat. That overheating can start a fire inside your walls, often before you realize anything is wrong. The New Jersey courts found that FPE had committed fraud in obtaining UL listing for these breakers, and while no official recall was ever issued, the consensus among electricians and fire safety experts is that FPE Stab-Lok panels should be replaced.
If you open your panel and see "Federal Pacific" on the door or "Stab-Lok" on the breakers, contact a licensed electrician to discuss replacement options. This is not a situation where you should wait until the panel gives you trouble, because the trouble may come in the form of a house fire.
### Zinsco Panels
Zinsco panels, manufactured from the 1970s through the early 1990s, have a different but equally serious problem. The aluminum bus bars inside these panels are prone to fusing with the breakers, which means the breaker may appear to be in the "off" position while still allowing current to flow. Additionally, the connection between the breaker and bus bar can develop hot spots that melt the surrounding plastic, creating both a shock and fire hazard.
Like FPE panels, Zinsco panels should be proactively replaced regardless of whether they are currently showing symptoms. Both brands are considered uninsurable by many Florida homeowners insurance carriers, which means having one can affect not just your safety but your ability to maintain coverage.
## Cost Breakdown for Florida Homeowners
Panel upgrade costs in Florida vary based on several factors, but here are realistic ranges based on current market conditions.
### 200-Amp Panel Upgrade
For a straightforward 200-amp upgrade where the service entrance, meter base, and weatherhead are in good condition, expect to pay between **$1,800 and $3,500** in Florida. This covers the new panel, breakers, labor, and permit fees.
The lower end of that range typically applies when the upgrade is a simple panel swap, the existing wiring is in good condition, and the utility company does not require a service entrance upgrade. The higher end comes into play when additional work is needed, such as replacing the meter base, upgrading the service entrance cable, or bringing the grounding system up to current code.
### Factors That Affect Cost
**Service entrance upgrade:** If your service entrance cable (the heavy wire running from the meter to the panel) is undersized, it must be replaced along with the panel. This can add $500 to $1,500 to the project.
**Meter base replacement:** Florida Power & Light, Duke Energy, and Tampa Electric each have specific requirements for meter bases. If yours does not meet current standards, replacement adds $300 to $800.
**Grounding system:** Current code requires two ground rods driven at least six feet apart, plus a connection to the home's water supply line (if metallic). Older homes may need grounding upgrades that add $200 to $500.
**Panel location:** If your panel is in a location that no longer meets code, such as inside a bathroom or closet that has been converted to a bedroom, relocation adds significant cost, often $1,000 to $3,000 depending on the distance.
**Permit and inspection fees:** Florida municipalities typically charge $75 to $250 for electrical permits. Some jurisdictions also require a separate utility permit.
### 400-Amp Service Upgrade
A full 400-amp [service upgrade](/services/service-upgrades) runs between $4,000 and $8,000, depending on the scope of work. This includes the 400-amp meter base, two 200-amp panels, service entrance cable, and all associated labor and permits.
## Florida Permit Requirements
Electrical panel upgrades require permits in every Florida jurisdiction. This is not optional, and it is not something you should try to skip. Here is why permits matter and what the process looks like.
### Why Permits Exist
The permit process ensures that electrical work meets the Florida Building Code, which adopts the National Electrical Code (NEC) with Florida-specific amendments. Inspections verify that the work is safe, properly installed, and will not create hazards for you or future homeowners.
Unpermitted work can also create serious problems when you sell your home. Title searches and insurance inspections can reveal unpermitted modifications, and resolving those issues after the fact is far more expensive and disruptive than permitting the work properly in the first place.
### The Permit Process in Florida
1. **Application:** Your electrician pulls the permit through the local building department. In Sarasota County, this is handled through the Building and Development Services office. Hillsborough County (Tampa) and Manatee County (Bradenton) each have their own process, but the fundamentals are the same.
2. **Plan review:** For straightforward panel upgrades, plan review is usually quick, sometimes same-day or next-day. More complex projects involving service entrance relocation or major load additions may require more detailed review.
3. **Work begins:** Once the permit is approved, the electrical work can proceed.
4. **Inspection:** After the work is complete, the building department sends an inspector to verify the installation. Common checkpoints include proper grounding, correct wire sizing, appropriate breaker ratings, weatherproof connections, and code-compliant labeling.
5. **Utility coordination:** For upgrades that involve the meter base or service entrance, the utility company must disconnect and reconnect power. Your electrician coordinates this, but it means you will be without power for a portion of the project, typically four to eight hours.
### Contractor Licensing
In Florida, electrical panel upgrades must be performed by a licensed electrical contractor. Florida issues two types of electrical licenses: the Certified Electrical Contractor (statewide) and the Registered Electrical Contractor (county-specific). Either is valid, but the contractor must hold an active license in the jurisdiction where the work is performed.
At Ranch and Coast Electric, we hold proper licensing and handle all permit applications, inspections, and utility coordination for our customers in [Sarasota](/areas/sarasota), [Tampa](/areas/tampa), [Bradenton](/areas/bradenton), and surrounding areas. Call us at **(708) 378-6058** to discuss your panel upgrade needs.
## The Upgrade Process Step by Step
Knowing what to expect makes the process far less stressful. Here is a typical timeline for a residential panel upgrade in Florida.
### Step 1: Initial Assessment (Day 1)
An electrician visits your home to evaluate the existing panel, service entrance, grounding system, and overall electrical infrastructure. They perform a load calculation to determine the appropriate panel size and identify any additional work that may be required.
This assessment typically takes 30 to 60 minutes and should result in a detailed written estimate that breaks down the scope of work and associated costs.
### Step 2: Permit Application (Days 2-5)
Your electrician submits the permit application along with any required documentation, such as a load calculation or site plan. Processing times vary by jurisdiction. Sarasota County often processes simple panel permits within one to two business days. Hillsborough County may take slightly longer during busy periods.
### Step 3: Utility Coordination (Days 3-10)
If the meter base or service entrance is being upgraded, your electrician contacts the utility company to schedule a disconnect and reconnect. FPL, Duke Energy, and TECO each have their own scheduling process, and lead times vary from a few days to two weeks depending on the season and workload.
### Step 4: Installation Day
On installation day, the utility company disconnects power at the meter. Your electrician then removes the old panel, installs the new panel and breakers, connects all existing circuits, upgrades the grounding system as needed, and prepares everything for inspection.
For a straightforward panel swap, this work takes five to eight hours. More complex projects involving service entrance upgrades or panel relocation may extend to a full day or carry into a second day.
### Step 5: Inspection and Reconnection
The building inspector reviews the installation and either approves it or identifies items that need correction. Once the inspection passes, the utility company reconnects power at the meter. In some jurisdictions, the inspector signs off on the reconnection directly, while others require a separate utility visit.
### Step 6: Final Walkthrough
Your electrician walks you through the new panel, explains the circuit directory, shows you how to reset breakers, and answers any remaining questions. This is also when you will receive your permit card showing the approved inspection.
## DIY vs Professional Installation
Let's be direct: a panel upgrade is not a DIY project. Here is why.
### Legal Requirements
Florida law requires that electrical panel work be performed by a licensed electrical contractor. It is not legal for a homeowner to pull a permit for their own panel upgrade in most Florida jurisdictions, and even in those that technically allow homeowner permits for certain electrical work, panel upgrades are typically excluded because they involve the utility company's metering equipment.
### Safety Concerns
The wires feeding your electrical panel carry the full amperage of your electrical service. In a 200-amp panel, that means the main lugs are carrying 200 amps at 240 volts. Contact with these conductors can cause fatal electrocution. Even with the main breaker off, the service entrance conductors running from the meter to the main breaker remain energized unless the utility disconnects power at the transformer or meter.
Professional electricians are trained to work safely around energized conductors and have the proper personal protective equipment (PPE) for the task. They also carry liability insurance that protects you if something goes wrong.
### Quality and Reliability
A panel upgrade done incorrectly can create problems that do not show up for months or years. Loose connections may work initially but gradually overheat as corrosion develops. Undersized conductors may handle the load during mild weather but fail when summer heat pushes your HVAC system to maximum draw. A professional electrician knows how to avoid these issues because they have performed hundreds or thousands of panel installations.
### The Bottom Line
Save the DIY spirit for projects where the consequences of a mistake are a crooked shelf or a paint drip. Your electrical panel is not the place to learn on the job.
## Frequently Asked Questions
### How long does a panel upgrade take?
Most residential panel upgrades are completed in a single day. A straightforward panel swap with no service entrance work takes five to eight hours. Projects that include meter base replacement, service entrance upgrades, or panel relocation may take one to two days. The permit process adds one to two weeks of lead time before the work begins.
### Will I lose power during the upgrade?
Yes. The utility company must disconnect power at the meter before the old panel is removed. You should plan for four to eight hours without electricity on installation day. If you have medical equipment that requires continuous power, make arrangements in advance such as a temporary generator or staying elsewhere during the work.
### How do I know if I have a Federal Pacific or Zinsco panel?
Open the panel door and look for the manufacturer's name. Federal Pacific Electric panels often have an orange or brown label with "Federal Pacific Electric" or "FPE" printed on them, and the breakers will say "Stab-Lok." Zinsco panels typically have a multicolored arrangement of breakers, often in pastel shades, and the panel door may read "Zinsco" or "GTE Sylvania." If you are unsure, send a photo to a licensed electrician for identification.
### Can I upgrade my panel without upgrading the service entrance?
Sometimes. If your existing service entrance cable is sized for the new panel amperage and is in good condition, it may not need replacement. However, if you are going from 100 amps to 200 amps, the service entrance cable will almost certainly need to be upgraded as well, since the existing cable will be undersized for the new panel's capacity. Your electrician will evaluate this during the initial assessment.
### Does a panel upgrade increase home value?
A panel upgrade can positively affect home value, particularly if the old panel was a known hazard like FPE or Zinsco, or if the home's electrical capacity was limiting its functionality. Real estate agents report that electrical deficiencies are among the most common issues flagged during home inspections, and having a modern panel with adequate capacity removes a potential obstacle to selling your home.
### What is the difference between a panel upgrade and a service upgrade?
A panel upgrade replaces the breaker panel itself, the metal box where all your circuits connect. A [service upgrade](/services/service-upgrades) replaces the entire electrical service, including the meter base, service entrance cable, weatherhead, and panel. Many panel upgrades include some service upgrade elements, but a full service upgrade is a more comprehensive project.
### Will my homeowner's insurance cover any of the cost?
Generally, no. Homeowner's insurance does not typically cover upgrades or improvements to your home's electrical system. However, upgrading from a hazardous panel like FPE or Zinsco may reduce your insurance premiums or resolve coverage issues, since some Florida insurers refuse to cover homes with these panels. Check with your insurance carrier before and after the upgrade.
---
Ready to discuss an [electrical panel upgrade](/services/electrical-panel-upgrades) for your home? Ranch and Coast Electric serves homeowners throughout [Sarasota](/areas/sarasota), [Tampa](/areas/tampa), [Bradenton](/areas/bradenton), and surrounding communities. Contact us at **(708) 378-6058** or visit [ranchandcoastelectric.com](https://ranchandcoastelectric.com) to schedule a consultation.
